Quick answer
OEM means the factory builds to your design; ODM means you adapt a design the factory already owns. The distinction decides who holds the intellectual property and how much of the development cost you fund. CHINAISPP runs custom projects through four stages — design for manufacture, tooling, sample approval, mass production — with a written specification, a golden sample and a first article report at each gate. Tooling is paid for by you and owned by you, with the mould drawing and steel certificate handed over on completion.
What custom manufacturing in China actually costs
Two numbers decide whether a custom product is viable, and buyers usually ask for only one of them. The first is the tooling cost, which is paid once and is visible in the quotation. The second is the minimum production quantity the tooling implies, which is not visible anywhere and is what makes a project fail financially six months later. A mould that costs three thousand dollars and requires a five thousand piece run is not a three thousand dollar project.
Design for manufacture is where the money is saved and where it is most often skipped. A wall thickness that is 0.2 mm too thin, a draft angle that will not release, a snap fit that needs a slide the tool cannot accommodate: each of these is cheap to change on a drawing and expensive to change on a cut steel mould. We put the design in front of the toolmaker before the mould is cut, in writing, and give you the feedback as options with cost attached.
Tooling ownership is the clause that matters most in the contract and the one buyers most often leave unaddressed. The mould should be yours, it should be identifiable as yours, and the drawing plus steel certificate should be handed to you when the project closes. Otherwise the factory that holds the tool holds the relationship, and every future quotation for that product starts from a position you cannot negotiate.
Private label is a lighter version of the same work. Where the product already exists, the project is artwork, packaging, labelling and compliance rather than tooling, and the timeline is measured in weeks. It is the right starting point for a first order, because it tests the market without committing to a mould. What it does not give you is exclusivity: the same product is available to anyone else who asks.
What we develop in this category
Six development routes. The first four involve tooling and a longer timeline; the last two do not.
Injection moulding
Rigid plastic parts and enclosures, from a single cavity tool to a family mould, with DFM feedback before steel is cut.
Die casting & stamping
Aluminium and zinc castings, pressed metal parts and progressive dies for higher volumes.
Silicone & rubber
Compression and liquid silicone moulding for consumer, kitchen and personal care products.
Textile & sewn goods
Pattern making, grading and sampling for bags, apparel, pet products and home textile.
Private label & packaging
Existing product plus your brand: artwork, dieline, labels, inserts and retail or e-commerce cartons.
Prototype to production
3D printed or CNC prototypes for form and fit, then a production-intent sample before tooling is released.
Development stages, deliverables and timing
A typical custom consumer product runs through these five gates. Compressing them is possible; skipping them moves the problem to the production run.
| Stage | What happens | Typical duration | What you receive |
|---|---|---|---|
| Specification | Requirements written into a document both sides accept: dimensions, materials, finish, function, packaging | 3–7 days | Written specification and target cost |
| Design for manufacture | Toolmaker reviews wall thickness, draft, tolerances and assembly sequence | 5–10 days | DFM report with costed change options |
| Tooling | Mould or die cut, steel grade recorded, trial shots produced | 25–45 days | Mould drawing, steel certificate, trial report |
| Sample approval | T1 samples reviewed, revised to T2, then a golden sample signed off and retained | 10–20 days | Sample units, measurement report, golden sample record |
| Mass production | Production run against the golden sample, first article checked, pre-shipment inspection | 20–35 days | First article report, AQL 2.5 inspection report, packing photos |
How a custom project is run
Each gate has a written output, and the next stage does not start until that output is approved. This is slower than verbal approval and much cheaper than discovering a problem in the container.
-
1
Brief and feasibility
We assess whether the product can be made at the target cost and volume, and say so if it cannot before you spend on tooling.
-
2
Factory matching by process
Not every factory that quotes can tool the part. We match on process capability and on whether the factory has made this product class before.
-
3
Tooling and first samples
Mould cut, trial shots produced, samples measured against the specification and reviewed with you before revision.
-
4
Golden sample and sign-off
The approved sample is retained by us and by the factory, and becomes the physical reference for the production run.
-
5
Production, first article, inspection
First article checked against the golden sample, then AQL 2.5 inspection, then packing and export.
Where this fits
This category is one of four we source. The other product lines, and the services that run around them, are below.
Frequently asked questions
What is the difference between OEM and ODM?
Who owns the mould after the project?
How many sample rounds should I budget for?
What does tooling actually cost?
Can you protect my design before I share it?
Ready to Source from China?